Wildlife Sculptures 
Making a Moa

<<<<< Back to Studio Work.        Page  1 | Page 2  | Page 3 | Page 4 | Page5 | Page 6 | Page 7 | Page 8| Page 9

   

 
Steel Pipe welded on inside of leg.

 

The steel pipe will be used to support the Moa on it's permanent base.

Slowly building up the steel rods to support the 20mm bird netting that will be cemented over.
Two Metre mark on the Door behind the Moa
 
 
 

Build up the muscles with more curved rods.

      

 

<<<<< Back to Studio Work.        Page  1 | Page 2  | Page 3 | Page 4 | Page5 | Page 6 | Page 7 | Page 8| Page 9



Contact Clive  at: Ashburton, NEW ZEALAND.

HOME / Gallery 123 / Contact Us /  About us / Prices (Text) / Order / Feedback / Studio Work  / Where we live / Links /       

Mobile: 021 2164 222  

Website:    http://www.wildlifesculptures.co.nz/